Monitoring the Albert Hall

A single Trimble monitoring system is all that’s required for a challenging site thanks to intelligent planning and a full understanding of the project’s challenges.
As the Albert Hall approaches its 150th birthday in 2021, the building is being prepared to tackle the next 150 years with a good clean-up and the installation of a two-storey, double height basement on the south-west quadrant of the building.

Termed ‘The Grand Excavation’, these works will open up around 1000m² of back-of-house space for the creation of facilities such as a new café area for visitors and a new multi-purpose space for artists, schools and community groups.
Download the full story
Attachment Size
Case Study_SRMAlbertHall.pdf (2.84 MB) 2.84 MB
Story Link
https://www.korecgroup.com/case_studies/monitoring-the-albert-hall-with-the-tri…